JCHA is providing this addendum to answer questions that have been raised with this solicitation. RFP submittals are to include the "General Response & Information Section" form enclosed within the RFP documents with the appropriate boxes checked regarding Addendums received. All Addendums will be posted at www.jchousing.org. The questions are in bold and the answers are immediately below.


Q1: Gym frequency and quarterly price. Pages 2 and 8 call for quarterly gym service, while page 5 says "bimonthly." Which frequency governs, how many services per year are required, and how many visits must the quarterly price include? If "bi-monthly" governs, please define it as a specific number of visits.
Quarterly, 4 times a year (one visit quarterly, four visits yearly, approximately every three months).

Q2: Extra gym visits and floor preparation. The walkthrough mentioned extra cleaning after events. Are those visits included in the base quarterly price or separately paid? Who authorizes them, how much notice is provided, and how should bidders quote them without changing the required price form? Who moves tables, boxes and other stored items off the court and returns them? Please confirm the gym floor material/finish and approved cleaning products and methods.
Extra gym cleanings may be requested in addition to the quarterly cleanings. If so that would be billed separately at the cost noted in section 21 4e (Quarterly Price) of the RFP submittal. A JCHA representative would authorize. Do not quote the extra cleaning cost. It will already be established in section 21 4e (Quarterly Price) of the RFP submittal and do not change the price form. Typically, notification would be at least 72 hours. Stored items will be removed by JCHA staff if applicable. Sweep and damp mop around these items. Gym floor is wood with a sealer. Contractor will be provided a mild cleaner for damp mopping.

Q3: Included rooms and floor areas. Can JCHA provide a marked floor plan or room-by-room cleaning list for each address, with included rooms, exclusions, floor types, restroom fixtures and window counts? For 841 Pardee, please identify the levels, stairs, offices, restrooms and storage areas included in the 1,871-square-foot weekly area and confirm that it excludes the separate 2,525-square-foot gym line. If plans are unavailable, how can bidders verify any areas that were inaccessible during the walkthrough before final pricing?
No marked floor plan. Contractor was to verify during previous walk-throughs. Cleaning list is noted in RFP. All accessible rooms are to be cleaned. It is already noted that the gym is listed separately. Include areas that were accessible during walk-through on final pricing.

Q4: VA location at 500 Washington Avenue. Please confirm the kitchen duties beyond floors and trash, including counters, sinks and appliance exteriors, and whether appliance interiors or dishwashing are excluded. Which offices, group rooms and closets are included or excluded? The walkthrough included closed or restricted rooms; should the crew skip closed doors or obtain access, and what procedure applies when an included room is occupied or locked?
Include counters, sinks and appliance exteriors. No appliance interior or dishwashing. All accessible rooms to be cleaned.

Q5: Weekly buildings and the "daily" task list. At 530 Robinson and the nongym portion of 841 Pardee, are tasks labeled "daily" performed once at each scheduled weekly visit, without additional daily attendance? Which weekday is preferred or required at each site? Please identify any task in the common scope table that does not apply at a particular site.
Daily tasks are to be performed at each scheduled visit based on the noted frequency. 901 Pardee, Mon-Thur./500 Washington, Mon-Fri./530 Robinson, Thursday/841 Pardee, Thursday.

Q6: Service windows, holidays and access interruptions. The RFP gives the earliest cleaning times. What is the latest permitted completion time at each site, and may weekly or periodic work occur on weekends? Please identify the 2027 holiday closures, whether missed visits require makeup service, and whether the fixed monthly price changes for holidays, closures or denied access. What is the first required service date after the January 1 start?
Work is expected to be completed by 12 AM midnight. Weekend wo1·k would be acceptable. Holiday closures are New Year's Day, MLK Day, President's Day, Memorial Day, Juneteenth Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving (day before), Thanksgiving, Christmas Eve, Christmas Day. An area does not need cleaned if it has been closed since the last cleaning. Fixed monthly pricing does not change however contractor to consider the closures when calculating monthly costs on submittal. January 4th, 2027.

Q7: Initial deep cleaning and specialty floor work. Initial deep cleaning was discussed during the walkthrough. Is a defined startup clean required in the base price, optional, or separately authorized and paid? Please identify any required machine scrubbing, tile/grout extraction, carpet extraction, stripping, waxing, burnishing or gym refinishing, with areas, methods and frequency. If these are outside the base scope, what written approval and pricing process applies?
Deep cleaning is not requested and will not be paid. Specialty floor work is not requested and will not be paid.

Q8: Twice-yearly accessible windows. Which windows and glass surfaces are included, and does "accessible" mean interior only or both sides? Please provide counts or approximate glass area, access heights, any ladder or exterior-access requirements, and whether screens and tracks are included. Are the two services scheduled by JCHA?
Windows and glass surfaces are for interior. Accessible means interior glass that can be reached without moving furniture or office supplies. It was and is the contractor's responsibility to field verify the glass areas. Screens and tracks are not applicable. The services are not scheduled by JCHA but can be coordinated through JCHA.

Q9: JCHA-provided supplies and equipment. Section 14 says JCHA provides cleaning supplies. Please itemize what is supplied at each site, including chemicals, soap, paper products, liners, vacuums, mops, carts and machines. Which tools, equipment, PPE or other materials must the contractor provide? Who orders and replenishes stock, maintains supplied equipment, and handles shortages? Is secure onsite storage available at every location?
All necessary supplies are provided by JCHA. Material Safety Data Sheets (MSDS) are available for cleaning supplies. Contractor is to call or text JCHA representative Travis Coffey at least 72 hours ahead of time for needed supplies and JCHA will deliver to appropriate onsite storage.

Q10: Security and site procedures. What background checks, site orientation or VA-specific approvals are required, who pays for them, and how much lead time is needed? How many crew members may receive keys/fobs? Please describe the training and after-hours contact process for alarms, lockouts and emergencies, without sending access codes in the bid response. Are there restrictions on moving desk items or photographing completed work?
Contractor is responsible for doing legitimate background checks on employees and submitting findings to Travis Coffey or other selected JCHA representative. JCHA to review findings and determine if acceptable before employee is allowed on site. Contractor to orientate and train their own employees. Questions from awardee regarding the scope of work to be directed to Travis Coffey. Owner/Manager to receive keys/ fobs and worker to receive same (2 sets total). Cleaning contractor awardee will set alarm. Travis Coffey will be primary contact for alums, lockouts, and emergencies. Do not move desk items or take photographs.

Q11: Waste and unusual cleaning. Please identify the approved dumpster/recycling locations and whether ordinary bagged waste is the full disposal scope. Are sharps, bodily-fluid cleanup or other regulated waste outside the base service, and who hand les them if encountered?
Dumpsters are located at close proximity to buildings and will be shown to the awardee. Ordinary bagged waste is the full disposal scope. Sharps and/or bodily-fluid cleanup is not in the scope of work however notify JCHA representative Travis Coffey if encountered.

Q12: Inspections and service corrections. Who inspects and accepts the work at each building? ls there an inspection checklist, service log or reporting format? What response time is required for a missed task or complaint, and are there specified deductions, penalties or required extra visits that bidders should allow for?
Contractor should inspect their own work and staff. JCHA staff may periodically inspect work. There is no checklist beyond the one provided in the RFP documents. JCHA will provide a reasonable response time and there will be no deductions provide the task is completed satisfactorily.

Q13: Labor requirements. Are any HUD-determined, prevailing-wage, minimum compensation, fringe-benefit or certified-payroll requirements applicable to this contract or any location? If so, please provide the applicable schedule and required reporting so all bidders use the same labor basis.
No. This is non-development work. Contractor to abide by federal and/or state minimum wage rates.

Q14: Pricing, payment and award details. We understand the form requires four monthly site prices plus a separate quarterly gym price and that invoices must be separate by location. When is the gym invoice submitted, and what payment terms apply to accepted invoices? Please confirm how reductions in locations/service frequency affect the price, whether award will be all locations together or may be split, and the expected award/transition timing. The location schedule lists 500 Washington Avenue as ZIP 37604, while the cost form says 37601; please confirm which should appear on the submitted form.
The gym invoice may be submitted after work completion but prefer to submit separately at the same time the other monthly invoices are submitted. Payment terms are 30 days from receipt of invoice. Pricing is determined by the monthly price RFP submittal. No deduction for less frequency due to holiday/closure however consider the closures when calculating monthly costs on submittal. If the location or frequency is not serviced as needed during a regular scheduled frequency visit, then an appropriate pro-rated deduction is expected and/or a return trip to remedy the situation may be in order. This is one award however the billing may be separate. Contract award is expected by mid- December. 500 Washington is located in the zip code 37604. You can leave the zip code as is on the form.